БИОСТРАТ
Livestock farming and organic resource handling

Livestock sector

Pig and cattle manure processing

Pig and cattle manure differ in collection, dilution, composition and handling. Each feedstock is assessed separately even when both are considered within one industrial programme.

01

Separate feedstock profiles

02

Composition and moisture testing

03

No pre-guaranteed product

What the qualification examines

BIOSTRAT reviews the source and handling system, annual and daily volume, water content, storage, transport, laboratory evidence, site and utility constraints.

Technical boundary

No product, including BIOSTRAT 10-10-10, is guaranteed in advance. A separate technological confirmation is required before process, product, economic or environmental conclusions are made.

Project routes

Choose the closest project context

Poultry manure processing

Preliminary qualification of poultry manure, farm operations, site and infrastructure for a BIOSTRAT industrial project.

Review this route

Pig and cattle manure processing

Separate qualification of pig and cattle manure before any processing route, product outcome or industrial configuration is proposed.

Review this route

Existing processing integration and modernisation

Technical review of installed equipment and processing lines to determine what may be retained, integrated, upgraded or replaced.

Review this route

Project qualification and site audit

Remote preliminary qualification, an extended project questionnaire and a separately scoped on-site technical audit for international industrial projects.

Review this route

Discuss the next qualified step

Submit the information currently available. BIOSTRAT will identify the evidence needed before any technical or commercial conclusion.

Contact BIOSTRAT